IELTS リーディングB26分

IELTS リーディング|川沿いの道

開通時期、工事範囲、調査で尋ねていないことを、3問で確認します。 無料で解説付き。

オリジナルのIELTS形式の練習です。結果はこの問題にのみ対応します。

In May the town opened the northern section of the Riverside Path to walkers and cyclists. Work on the southern section continued until September, when the two sections were connected.

Rather than paving the entire riverbank, engineers kept a strip of reeds between the path and the water. A short boardwalk gives visitors a view without requiring them to enter the reeds.

A survey asked visitors about travel habits and perceived safety. Most respondents said the route made them feel safer. The survey did not ask how much participants spent at nearby businesses.

問題 1/3Both sections were open in May.